|
The Assembly of Biomorphic Structures
>> View 1 - the space sculpture Nautilus at EuroShop 2002
>> View 2 - detailed view of tube connectors at disc node
The erection of free shape constructions with the M12 tube and node systems is much easier than one might believe. Computerized manufacturing of the MERO tubes and nodes secures a precise production of the material. In the 'Nautilus' structure, for example, 226 of the 1308 tubes have different lengths. The nodes, however, are still more individual: Each of the 477 nodes has a different drilling angle and therefore has an unequivocal position within the 'Nautilus'. The arrangement of the tubes and nodes according to their position into numbered boxes, secures a quick and problem-free assembling on site.
Construction times: For a free shape construction in the dimensions of the 'Nautilus' ( i.e. 88.5 running feet at ground plan and 16 feet high) installation time is approximately 12 hours with four installers.
|